By default Isogen Isometric Bill of Materials has the ability to populate components types to specific Material Groups as seen below.
There may be cases where users require component types to be populated under different material group sections in the Bill of Material.
Please follow the link below to download PDF instructions on how to achieve this.
Isogen Material Group Transfer FAQ.pdf
Should you have any queries, please contact wtheron@chempute.com
Friday, 6 October 2017
Friday, 15 September 2017
AFT Fathom 9 Maintenance Release
New Maintenance Release Available
Release Date: September 12, 2017
Version: 9.0.1238
AFT Fathom Users that are current with Maintenance can now login to the AFT website and download the latest version release using the link below.
AFT Arrow 6 Maintenance Releases
New Maintenance Release AvailableRelease Date: September 12, 2017
Version: 6.0.1217
AFT Arrow Users that are current with Maintenance can now login to the AFT website and download the latest version release using the link below.
AFT Impulse 6 Maintenance Release
New Maintenance Release Available
Release Date: September 12, 2017
Version: 6.0.1126
Download
Monday, 28 August 2017
Orthogen Hot Fix Release (10.02.00.5615)
|
Hexagon has uploaded Orthogen_Update_10.02.00.5615.zip
for Orthogen Version 10.2. This Hot Fix is now available for
download from Hexagon Smart Support System. Further information
about what is contained in this Hot Fix is available in the Readme File link shown in
the download description on the Service
Packs and Fixes page.
To access this Hot Fix, please follow the steps below:
|
Monday, 21 August 2017
CAESAR II 2018 Release
Hexagon and Chempute Software are excited to announce the release of Caesar II 2018
CAESAR II 2018 (v. 10.0) features:
- Support for KHK Level 2 seismic analysis
- Better support identification and tracking through new
(Tag) fields
- Automatic renumbering of load cases upon delete
- Support for the latest editions of many piping code
standards
- A fully-redesigned API-610 equipment module
- Newly-published ASME B31J-2017 calculations available
free in CAESAR II (through FEATools options, with no PRG license required)
Hexagon have also made several enhancements to 3D model behavior and many other improvements
that speed up your time working with piping models.
Don’t miss next week’s “What’s
New in CAESAR II 2018” webinars: Tues., August 22nd at 9
p.m. (CST) or Thurs., August 24 at 10 a.m. (CST),
Thursday, 6 July 2017
Hexagon PPM is the New Brand for Intergraph® Process, Power & Marine
The world’s leading
engineering software company is today embracing a new brand and a honed vision
for enabling the smart digital industrial facility and extending its expertise
into new markets like Architecture, Engineering and Construction (AEC).
Intergraph Process, Power & Marine – acquired by Hexagon AB in July 2010 – will now be known as Hexagon PPM. Hexagon PPM is focused on delivering end-to-end information technology solutions that drive efficiencies during the design, construction and operation of industrial facilities and large-scale construction projects.
Because of Intergraph’s first-in-class reputation, Hexagon PPM products will continue to carry the Intergraph brand name. “PPM” is retained as a nod to the key industries of process, power, and marine; however, Hexagon PPM will expand its base to serve industries beyond its traditional core.
Recent acquisitions, including project controls technology (EcoSys) and fabrication automation technology (NESTIX Oy), and the recently launched HxGN SMART Build solution targeted at enterprise BIM construction execution for the AEC industry, are enabling Hexagon PPM to diversify its customer base.
The company’s new president, Mattias Stenberg, assumed PPM’s helm in January, transitioning from Hexagon’s Chief Strategy Officer, a role he held since 2009.
“The name change isn't just a name change,” Stenberg said. “It represents a closer alignment with Hexagon that will open up new doors to truly leverage the depth and breadth of Hexagon’s innovations and technological capabilities. It’s an opportunity to overcome the slow pace of change that has characterized PPM’s primary industries over the past 20 years.”
http://hexagonppm.com/en/news/rebrand-to-hexagon-ppm
Intergraph Process, Power & Marine – acquired by Hexagon AB in July 2010 – will now be known as Hexagon PPM. Hexagon PPM is focused on delivering end-to-end information technology solutions that drive efficiencies during the design, construction and operation of industrial facilities and large-scale construction projects.
Because of Intergraph’s first-in-class reputation, Hexagon PPM products will continue to carry the Intergraph brand name. “PPM” is retained as a nod to the key industries of process, power, and marine; however, Hexagon PPM will expand its base to serve industries beyond its traditional core.
Recent acquisitions, including project controls technology (EcoSys) and fabrication automation technology (NESTIX Oy), and the recently launched HxGN SMART Build solution targeted at enterprise BIM construction execution for the AEC industry, are enabling Hexagon PPM to diversify its customer base.
The company’s new president, Mattias Stenberg, assumed PPM’s helm in January, transitioning from Hexagon’s Chief Strategy Officer, a role he held since 2009.
“The name change isn't just a name change,” Stenberg said. “It represents a closer alignment with Hexagon that will open up new doors to truly leverage the depth and breadth of Hexagon’s innovations and technological capabilities. It’s an opportunity to overcome the slow pace of change that has characterized PPM’s primary industries over the past 20 years.”
http://hexagonppm.com/en/news/rebrand-to-hexagon-ppm
Subscribe to:
Posts (Atom)





